Home Improvements
From Gothpoodle
(Difference between revisions)
Line 15: | Line 15: | ||
* '''''6/23/08:''''' Completed painting of garage, arbor, and warranty work on house. | * '''''6/23/08:''''' Completed painting of garage, arbor, and warranty work on house. | ||
* '''''6/30/08:''''' Replace the windows in the two upstairs bedrooms. | * '''''6/30/08:''''' Replace the windows in the two upstairs bedrooms. | ||
+ | |||
+ | * '''''Summer/08:''''' Completed construction of stone planter i front of house. | ||
+ | * '''''Summer/08:''''' Touch up of exteror house painting. | ||
+ | * '''''Summer/08:''''' Had garage and arbor painted. | ||
+ | |||
+ | * '''''03/01/09''''' Had new ht water tank installed. | ||
'''Current:''' | '''Current:''' | ||
- | * | + | * Have old kitchen pipes capped. |
* Landscape the side of the house. | * Landscape the side of the house. | ||
* Landscape the front and back of the house. | * Landscape the front and back of the house. | ||
+ | * Replace the back bedroom windows. | ||
* Replace the windows in the bathroom and stair landing. | * Replace the windows in the bathroom and stair landing. | ||
- | ''' | + | '''2009:''' |
* Install new furnace. | * Install new furnace. | ||
- | |||
- | |||
* Finish the kitchen (cap pipes, re-walling, fixing damaged floor). | * Finish the kitchen (cap pipes, re-walling, fixing damaged floor). | ||
* Rip down old and put in new gutters. | * Rip down old and put in new gutters. | ||
Line 38: | Line 43: | ||
'''Maybes:''' | '''Maybes:''' | ||
+ | * Install radiator covers. | ||
* Install block windows in the basement. | * Install block windows in the basement. | ||
* Reconstruct front steps and pillar. | * Reconstruct front steps and pillar. | ||
Line 51: | Line 57: | ||
* Carpet last bedroom. | * Carpet last bedroom. | ||
* New doors throughout the house. | * New doors throughout the house. | ||
+ | * New doorknobs throughout the house. |
Revision as of 16:15, 1 March 2009
Listed in order of importance/projected time frame.
Completed:
- 7/09/05: Carpeted upstairs side bedroom.
- 3/31/06: Replaced carpeting in living room, all hallways, and stairway.
- 8/18/06: Ripped out bushes in the front of the house.
- 9/15/06: Replaced all the windows in the front room.
- 9/17/06: Replaced the water-damaged clapboard.
- 9/18/06: Windows wrapped with vinyl trim, clapboard primed with one coat.
- 11/03/06: Put in a new side (security) door.
- 7/18/07: Had the house repainted.
- 10/29/07: Put new release valve on furnace.
- 2/22/08: Replaced side door (cosmetic damage on original installation).
- 6/09/08: Finished construction of stone planter in front of house.
- 6/23/08: Completed painting of garage, arbor, and warranty work on house.
- 6/30/08: Replace the windows in the two upstairs bedrooms.
- Summer/08: Completed construction of stone planter i front of house.
- Summer/08: Touch up of exteror house painting.
- Summer/08: Had garage and arbor painted.
- 03/01/09 Had new ht water tank installed.
Current:
- Have old kitchen pipes capped.
- Landscape the side of the house.
- Landscape the front and back of the house.
- Replace the back bedroom windows.
- Replace the windows in the bathroom and stair landing.
2009:
- Install new furnace.
- Finish the kitchen (cap pipes, re-walling, fixing damaged floor).
- Rip down old and put in new gutters.
- Fix wiring and install light fixture in back hallway.
- Fix porch light.
- Install new doorbell.
- Refinish sun room floor.
- Refinish dining room floor.
Maybes:
- Install radiator covers.
- Install block windows in the basement.
- Reconstruct front steps and pillar.
- Replace the windows in the downstairs bedrooms.
- Replace the windows in living room, dining room, and stairs.
- Redo the first floor bathroom.
Ongoing:
- Random painting throughout the house.
- Random patching.
- Replace old carpeting.
- Carpet last bedroom.
- New doors throughout the house.
- New doorknobs throughout the house.