Home Improvements

From Gothpoodle

(Difference between revisions)
Jump to: navigation, search
Line 10: Line 10:
* '''''11/03/06:''''' Put in a new side (security) door.
* '''''11/03/06:''''' Put in a new side (security) door.
* '''''7/18/07:''''' Had the house repainted.
* '''''7/18/07:''''' Had the house repainted.
 +
* '''''10/29/07:''''' Put new release valve on furnace.
'''Current:'''
'''Current:'''
-
* Landscape the side of the house. (7/07)
+
* Install new furnace.
-
* Landscape the front and back of the house. (8/07)
+
* Install new hot water tank.
-
* Refinish sun room floor.
+
* Install radiator covers.
-
* Refinish dining room floor.
+
-
'''2007:'''
+
'''2008:'''
* Finish the kitchen (cap pipes, re-walling, fixing damaged floor).
* Finish the kitchen (cap pipes, re-walling, fixing damaged floor).
* Install block windows in the basement.
* Install block windows in the basement.
Line 27: Line 27:
* Fix porch light.
* Fix porch light.
* Install new doorbell.
* Install new doorbell.
-
 
+
* Landscape the side of the house.
-
 
+
* Landscape the front and back of the house.
-
'''2008:'''
+
* Refinish sun room floor.
-
* Install radiator covers.
+
* Refinish dining room floor.
-
* Install a new hot water tank.
+
* Replace the windows in the upstairs bedrooms and in the bathroom.
* Replace the windows in the upstairs bedrooms and in the bathroom.
* Replace the rest of the old fencing in the backyard. (Oneida Fence)
* Replace the rest of the old fencing in the backyard. (Oneida Fence)
* Replace the windows in the downstairs bedrooms.
* Replace the windows in the downstairs bedrooms.
* Replace the windows in living room, dining room, and stairs.
* Replace the windows in living room, dining room, and stairs.
-
 
-
 
-
'''2009 and beyond:'''
 
* Redo the first floor bathroom.
* Redo the first floor bathroom.
-
* Refinish the attic space (either as master bedroom or play space).
 
-
* Construct a second floor bathroom.
 
-
* Refinish the basement.
 

Revision as of 12:41, 30 October 2007

Listed in order of importance/projected time frame.

Completed:

  • 7/09/05: Carpeted upstairs side bedroom.
  • 3/31/06: Replaced carpeting in living room, all hallways, and stairway.
  • 8/18/06: Ripped out bushes in the front of the house.
  • 9/15/06: Replaced all the windows in the front room.
  • 9/17/06: Replaced the water-damaged clapboard.
  • 9/18/06: Windows wrapped with vinyl trim, clapboard primed with one coat.
  • 11/03/06: Put in a new side (security) door.
  • 7/18/07: Had the house repainted.
  • 10/29/07: Put new release valve on furnace.


Current:

  • Install new furnace.
  • Install new hot water tank.
  • Install radiator covers.


2008:

  • Finish the kitchen (cap pipes, re-walling, fixing damaged floor).
  • Install block windows in the basement.
  • Rip down old and put in new gutters.
  • Reconstruct front steps and pillar.
  • Fix wiring and install light fixture in back hallway.
  • Fix porch light.
  • Install new doorbell.
  • Landscape the side of the house.
  • Landscape the front and back of the house.
  • Refinish sun room floor.
  • Refinish dining room floor.
  • Replace the windows in the upstairs bedrooms and in the bathroom.
  • Replace the rest of the old fencing in the backyard. (Oneida Fence)
  • Replace the windows in the downstairs bedrooms.
  • Replace the windows in living room, dining room, and stairs.
  • Redo the first floor bathroom.


Ongoing:

  • Random painting throughout the house.
  • Random patching.
  • Replace old carpeting.
  • Carpet last bedroom.
  • New doors throughout the house.
Personal tools