Home Improvements
From Gothpoodle
(Difference between revisions)
Line 7: | Line 7: | ||
* '''''9/18/06:''''' Have windows wrapped with vinyl trim. | * '''''9/18/06:''''' Have windows wrapped with vinyl trim. | ||
* '''''9/18/06:''''' Clapboard primed with one coat. | * '''''9/18/06:''''' Clapboard primed with one coat. | ||
+ | |||
'''Current:''' | '''Current:''' |
Revision as of 21:40, 18 September 2006
Listed in order of importance/projected time frame.
Completed:
- 8/18/06: Rip out bushes in the front of the house.
- 9/15/06: Replace all the windows in the front room.
- 9/17/06: Replace the water-damaged clapboard.
- 9/18/06: Have windows wrapped with vinyl trim.
- 9/18/06: Clapboard primed with one coat.
Current:
- Put in a new side (security) door.
- Install radiator covers.
2006:
- Install a new hot water tank. ($850)
- Finish the kitchen (cap pipes, re-walling, fixing damaged floor).
- Rip out the sun room carpeting and refloor. ($600)
- Refloor dining room floor (overlay). ($600)
2007:
- Have the house repainted. ($2500)
- Rip down old and put in new gutters. ($1200)
- Reconstruct front steps and pillar.
- Fix wiring and install light fixture in back hallway.
- Fix porch light.
- Install new doorbell.
- Replace the windows in the upstairs bedrooms and in the bathroom.
- Landscape the front of the house (keep hostas and little bush).
- Replace the rest of the old fencing in the backyard. (Check w/ Oneida Fence)
- Replace the windows in the downstairs bedrooms.
- Replace the windows in living room, dining room, and stairs.
- Landscape the back of the house.
- Block windows for the basement.
2008 and beyond:
- Redo the first floor bathroom.
- Refinish the attic space (either as master bedroom or play space).
- Construct a second floor bathroom.
- Refinish the basement.
Ongoing:
- Random painting throughout the house.
- Random patching.
- Replace old carpeting.
- Carpet last bedroom.
- New doors throughout the house.