Home Improvements
From Gothpoodle
(Difference between revisions)
Line 40: | Line 40: | ||
'''Ongoing:''' | '''Ongoing:''' | ||
* Random painting throughout the house. | * Random painting throughout the house. | ||
+ | * Replace old carpeting. | ||
+ | * Carpet last bedroom. |
Revision as of 15:29, 16 September 2006
Listed in order of importance/projected time frame.
Current:
- Rip out bushes in the front of the house. Completed 8/18/06.
- Replace all the windows in the sun room. Completed 9/15/06.
- Replace the water-damaged clapboard.
- Have windows wrapped with vinyl trim.
- Put in a new side (security) door.
2006:
- Install a new hot water tank.
- Finish the kitchen (cap pipes, re-walling, fixing damaged floor).
- Rip out the sun room carpeting and refloor.
- Refloor dining room floor (overlay).
2007:
- Have the house repainted.
- Rip down old and put in new gutters.
- Reconstruct front steps and pillar.
- Fix wiring and install light fixture in back hallway.
- Fix porch light.
- Install new doorbell.
- Replace the windows in the upstairs bedrooms and in the bathroom.
- Landscape the front of the house (keep hostas and little bush).
- Replace the rest of the old fencing in the backyard.
- Replace the windows in the downstairs bedrooms.
- Replace the windows in living room, dining room, and stairs.
- Landscape the back of the house.
2008 and beyond:
- Redo the first floor bathroom.
- Refinish the attic space (either as master bedroom or play space).
- Construct a second floor bathroom.
- Refinish the basement.
Ongoing:
- Random painting throughout the house.
- Replace old carpeting.
- Carpet last bedroom.