Home Improvements

From Gothpoodle

(Difference between revisions)
Jump to: navigation, search
Line 3: Line 3:
'''Current:'''
'''Current:'''
* Rip out bushes in the front of the house. '''''Completed 8/18/06.'''''
* Rip out bushes in the front of the house. '''''Completed 8/18/06.'''''
-
* Replace all the windows in the sun room.
+
* Replace all the windows in the sun room. '''''Completed 9/15/06.'''''
 +
* Replace the water-damaged clapboard.
 +
* Have windows wrapped with vinyl trim.
* Put in a new side (security) door.
* Put in a new side (security) door.
'''2006:'''
'''2006:'''
-
* Replace the water-damaged clapboard.
 
-
* Have the house repainted.
 
-
* Rip down old and put in new gutters.
 
-
* Landscape the front of the house.
 
* Install a new hot water tank.
* Install a new hot water tank.
* Finish the kitchen (cap pipes, re-walling, fixing damaged floor).
* Finish the kitchen (cap pipes, re-walling, fixing damaged floor).
* Rip out the sun room carpeting and refloor.
* Rip out the sun room carpeting and refloor.
-
* Rip out dining room floor and refloor.
+
* Refloor dining room floor (overlay).
-
* Fix wiring and install light fixture in back hallway.
+
-
* Random painting throughout the house.
+
'''2007:'''
'''2007:'''
 +
* Have the house repainted.
 +
* Rip down old and put in new gutters.
 +
* Fix wiring and install light fixture in back hallway.
 +
* Fix porch light.
 +
* Install new doorbell.
* Replace the windows in the upstairs bedrooms and in the bathroom.
* Replace the windows in the upstairs bedrooms and in the bathroom.
* Landscape the front of the house (keep hostas and little bush).
* Landscape the front of the house (keep hostas and little bush).
Line 34: Line 35:
* Construct a second floor bathroom.
* Construct a second floor bathroom.
* Refinish the basement.
* Refinish the basement.
 +
 +
 +
'''Ongoing:'''
 +
* Random painting throughout the house.

Revision as of 16:10, 15 September 2006

Listed in order of importance/projected time frame.

Current:

  • Rip out bushes in the front of the house. Completed 8/18/06.
  • Replace all the windows in the sun room. Completed 9/15/06.
  • Replace the water-damaged clapboard.
  • Have windows wrapped with vinyl trim.
  • Put in a new side (security) door.


2006:

  • Install a new hot water tank.
  • Finish the kitchen (cap pipes, re-walling, fixing damaged floor).
  • Rip out the sun room carpeting and refloor.
  • Refloor dining room floor (overlay).


2007:

  • Have the house repainted.
  • Rip down old and put in new gutters.
  • Fix wiring and install light fixture in back hallway.
  • Fix porch light.
  • Install new doorbell.
  • Replace the windows in the upstairs bedrooms and in the bathroom.
  • Landscape the front of the house (keep hostas and little bush).
  • Replace the rest of the old fencing in the backyard.
  • Replace the windows in the downstairs bedrooms.
  • Replace the windows in living room, dining room, and stairs.
  • Landscape the back of the house.


2008 and beyond:

  • Redo the first floor bathroom.
  • Refinish the attic space (either as master bedroom or play space).
  • Construct a second floor bathroom.
  • Refinish the basement.


Ongoing:

  • Random painting throughout the house.
Personal tools