Home Improvements
From Gothpoodle
(Difference between revisions)
Line 15: | Line 15: | ||
'''Current:''' | '''Current:''' | ||
- | * | + | * Paint garage and arbor. (Third week of May.) |
- | * | + | * Touch up chipping portions on house. (Third week of May.) |
- | * | + | * Fence off back of property. (Oneida Fence, after painting.) |
+ | * Landscape the side of the house. | ||
+ | * Landscape the front and back of the house. | ||
+ | * Replace the windows in the upstairs bedrooms and in the bathroom. | ||
'''2008:''' | '''2008:''' | ||
+ | * Install new furnace. | ||
+ | * Install new hot water tank. | ||
+ | * Install radiator covers. | ||
* Finish the kitchen (cap pipes, re-walling, fixing damaged floor). | * Finish the kitchen (cap pipes, re-walling, fixing damaged floor). | ||
- | |||
* Rip down old and put in new gutters. | * Rip down old and put in new gutters. | ||
- | |||
* Fix wiring and install light fixture in back hallway. | * Fix wiring and install light fixture in back hallway. | ||
* Fix porch light. | * Fix porch light. | ||
* Install new doorbell. | * Install new doorbell. | ||
- | |||
- | |||
* Refinish sun room floor. | * Refinish sun room floor. | ||
* Refinish dining room floor. | * Refinish dining room floor. | ||
- | * | + | |
- | * | + | |
+ | '''Maybes:''' | ||
+ | * Install block windows in the basement. | ||
+ | * Reconstruct front steps and pillar. | ||
* Replace the windows in the downstairs bedrooms. | * Replace the windows in the downstairs bedrooms. | ||
* Replace the windows in living room, dining room, and stairs. | * Replace the windows in living room, dining room, and stairs. | ||
* Redo the first floor bathroom. | * Redo the first floor bathroom. | ||
- | + | ||
'''Ongoing:''' | '''Ongoing:''' |
Revision as of 15:52, 1 May 2008
Listed in order of importance/projected time frame.
Completed:
- 7/09/05: Carpeted upstairs side bedroom.
- 3/31/06: Replaced carpeting in living room, all hallways, and stairway.
- 8/18/06: Ripped out bushes in the front of the house.
- 9/15/06: Replaced all the windows in the front room.
- 9/17/06: Replaced the water-damaged clapboard.
- 9/18/06: Windows wrapped with vinyl trim, clapboard primed with one coat.
- 11/03/06: Put in a new side (security) door.
- 7/18/07: Had the house repainted.
- 10/29/07: Put new release valve on furnace.
- 2/22/08: Replaced side door (cosmetic damage on original installation).
Current:
- Paint garage and arbor. (Third week of May.)
- Touch up chipping portions on house. (Third week of May.)
- Fence off back of property. (Oneida Fence, after painting.)
- Landscape the side of the house.
- Landscape the front and back of the house.
- Replace the windows in the upstairs bedrooms and in the bathroom.
2008:
- Install new furnace.
- Install new hot water tank.
- Install radiator covers.
- Finish the kitchen (cap pipes, re-walling, fixing damaged floor).
- Rip down old and put in new gutters.
- Fix wiring and install light fixture in back hallway.
- Fix porch light.
- Install new doorbell.
- Refinish sun room floor.
- Refinish dining room floor.
Maybes:
- Install block windows in the basement.
- Reconstruct front steps and pillar.
- Replace the windows in the downstairs bedrooms.
- Replace the windows in living room, dining room, and stairs.
- Redo the first floor bathroom.
Ongoing:
- Random painting throughout the house.
- Random patching.
- Replace old carpeting.
- Carpet last bedroom.
- New doors throughout the house.