Home Improvements
From Gothpoodle
(Difference between revisions)
Line 12: | Line 12: | ||
'''Current:''' | '''Current:''' | ||
- | * | + | * Have the house repainted. |
- | * | + | * Refinish sun room floor. |
- | * | + | * Refinish dining room floor. |
'''2007:''' | '''2007:''' | ||
- | * | + | * Landscape the front of the house (keep hostas and little bush). |
- | + | ||
* Finish the kitchen (cap pipes, re-walling, fixing damaged floor). | * Finish the kitchen (cap pipes, re-walling, fixing damaged floor). | ||
* Install block windows in the basement. | * Install block windows in the basement. | ||
- | |||
* Rip down old and put in new gutters. ($1200) | * Rip down old and put in new gutters. ($1200) | ||
* Reconstruct front steps and pillar. | * Reconstruct front steps and pillar. | ||
Line 28: | Line 26: | ||
* Fix porch light. | * Fix porch light. | ||
* Install new doorbell. | * Install new doorbell. | ||
- | |||
- | |||
- | |||
- | |||
- | |||
'''2008 and beyond:''' | '''2008 and beyond:''' | ||
+ | * Replace the rest of the old fencing in the backyard. (Check w/ Oneida Fence) | ||
+ | * Landscape the back of the house. | ||
+ | * Install a new hot water tank. ($850) | ||
+ | * Replace the windows in the downstairs bedrooms. | ||
+ | * Replace the windows in living room, dining room, and stairs. | ||
+ | * Replace the windows in the upstairs bedrooms and in the bathroom. | ||
+ | * Install radiator covers. | ||
* Redo the first floor bathroom. | * Redo the first floor bathroom. | ||
* Refinish the attic space (either as master bedroom or play space). | * Refinish the attic space (either as master bedroom or play space). |
Revision as of 21:42, 25 March 2007
Listed in order of importance/projected time frame.
Completed:
- 7/09/05: Carpeted upstairs side bedroom.
- 3/31/06: Replaced carpeting in living room, all hallways, and stairway.
- 8/18/06: Ripped out bushes in the front of the house.
- 9/15/06: Replaced all the windows in the front room.
- 9/17/06: Replaced the water-damaged clapboard.
- 9/18/06: Windows wrapped with vinyl trim, clapboard primed with one coat.
- 11/03/06: Put in a new side (security) door.
Current:
- Have the house repainted.
- Refinish sun room floor.
- Refinish dining room floor.
2007:
- Landscape the front of the house (keep hostas and little bush).
- Finish the kitchen (cap pipes, re-walling, fixing damaged floor).
- Install block windows in the basement.
- Rip down old and put in new gutters. ($1200)
- Reconstruct front steps and pillar.
- Fix wiring and install light fixture in back hallway.
- Fix porch light.
- Install new doorbell.
2008 and beyond:
- Replace the rest of the old fencing in the backyard. (Check w/ Oneida Fence)
- Landscape the back of the house.
- Install a new hot water tank. ($850)
- Replace the windows in the downstairs bedrooms.
- Replace the windows in living room, dining room, and stairs.
- Replace the windows in the upstairs bedrooms and in the bathroom.
- Install radiator covers.
- Redo the first floor bathroom.
- Refinish the attic space (either as master bedroom or play space).
- Construct a second floor bathroom.
- Refinish the basement.
Ongoing:
- Random painting throughout the house.
- Random patching.
- Replace old carpeting.
- Carpet last bedroom.
- New doors throughout the house.