Home Improvements

From Gothpoodle

(Difference between revisions)
Jump to: navigation, search
Line 1: Line 1:
''Listed in order of importance/projected time frame.''
''Listed in order of importance/projected time frame.''
 +
 +
'''Completed:'''
 +
* '''''8/18/06:''''' Rip out bushes in the front of the house.
 +
* '''''9/15/06:''''' Replace all the windows in the front room.
 +
* '''''9/17/06:''''' Replace the water-damaged clapboard.
 +
* '''''9/17/06:''''' Have windows wrapped with vinyl trim.
 +
'''Current:'''
'''Current:'''
-
* Rip out bushes in the front of the house. '''''Completed 8/18/06.'''''
 
-
* Replace all the windows in the sun room. '''''Completed 9/15/06.'''''
 
-
* Replace the water-damaged clapboard.
 
-
* Have windows wrapped with vinyl trim.
 
* Put in a new side (security) door.
* Put in a new side (security) door.
 +
* Install radiator covers.
'''2006:'''
'''2006:'''
-
* Install a new hot water tank.
+
* Install a new hot water tank. ($850)
* Finish the kitchen (cap pipes, re-walling, fixing damaged floor).
* Finish the kitchen (cap pipes, re-walling, fixing damaged floor).
-
* Rip out the sun room carpeting and refloor.
+
* Rip out the sun room carpeting and refloor. ($600)
-
* Refloor dining room floor (overlay).
+
* Refloor dining room floor (overlay). ($600)
'''2007:'''
'''2007:'''
-
* Have the house repainted.
+
* Have the house repainted. ($2500)
-
* Rip down old and put in new gutters.
+
* Rip down old and put in new gutters. ($1200)
* Reconstruct front steps and pillar.
* Reconstruct front steps and pillar.
* Fix wiring and install light fixture in back hallway.
* Fix wiring and install light fixture in back hallway.
Line 25: Line 29:
* Replace the windows in the upstairs bedrooms and in the bathroom.
* Replace the windows in the upstairs bedrooms and in the bathroom.
* Landscape the front of the house (keep hostas and little bush).
* Landscape the front of the house (keep hostas and little bush).
-
* Replace the rest of the old fencing in the backyard.
+
* Replace the rest of the old fencing in the backyard. (Check w/ Oneida Fence)
* Replace the windows in the downstairs bedrooms.
* Replace the windows in the downstairs bedrooms.
* Replace the windows in living room, dining room, and stairs.
* Replace the windows in living room, dining room, and stairs.
* Landscape the back of the house.
* Landscape the back of the house.
 +
* Block windows for the basement.
Line 40: Line 45:
'''Ongoing:'''
'''Ongoing:'''
* Random painting throughout the house.
* Random painting throughout the house.
 +
* Random patching.
* Replace old carpeting.
* Replace old carpeting.
* Carpet last bedroom.
* Carpet last bedroom.
 +
* New doors throughout the house.

Revision as of 15:31, 17 September 2006

Listed in order of importance/projected time frame.

Completed:

  • 8/18/06: Rip out bushes in the front of the house.
  • 9/15/06: Replace all the windows in the front room.
  • 9/17/06: Replace the water-damaged clapboard.
  • 9/17/06: Have windows wrapped with vinyl trim.


Current:

  • Put in a new side (security) door.
  • Install radiator covers.


2006:

  • Install a new hot water tank. ($850)
  • Finish the kitchen (cap pipes, re-walling, fixing damaged floor).
  • Rip out the sun room carpeting and refloor. ($600)
  • Refloor dining room floor (overlay). ($600)


2007:

  • Have the house repainted. ($2500)
  • Rip down old and put in new gutters. ($1200)
  • Reconstruct front steps and pillar.
  • Fix wiring and install light fixture in back hallway.
  • Fix porch light.
  • Install new doorbell.
  • Replace the windows in the upstairs bedrooms and in the bathroom.
  • Landscape the front of the house (keep hostas and little bush).
  • Replace the rest of the old fencing in the backyard. (Check w/ Oneida Fence)
  • Replace the windows in the downstairs bedrooms.
  • Replace the windows in living room, dining room, and stairs.
  • Landscape the back of the house.
  • Block windows for the basement.


2008 and beyond:

  • Redo the first floor bathroom.
  • Refinish the attic space (either as master bedroom or play space).
  • Construct a second floor bathroom.
  • Refinish the basement.


Ongoing:

  • Random painting throughout the house.
  • Random patching.
  • Replace old carpeting.
  • Carpet last bedroom.
  • New doors throughout the house.
Personal tools