Home Improvements

From Gothpoodle

(Difference between revisions)
Jump to: navigation, search
 
(12 intermediate revisions not shown)
Line 10: Line 10:
* '''''11/03/06:''''' Put in a new side (security) door.
* '''''11/03/06:''''' Put in a new side (security) door.
* '''''7/18/07:''''' Had the house repainted.
* '''''7/18/07:''''' Had the house repainted.
 +
* '''''10/29/07:''''' Put new release valve on furnace.
 +
* '''''2/22/08:''''' Replaced side door (cosmetic damage on original installation).
 +
* '''''6/09/08:''''' Finished construction of stone planter in front of house.
 +
* '''''6/23/08:''''' Completed painting of garage, arbor, and warranty work on house.
 +
* '''''6/30/08:''''' Replace the windows in the two upstairs bedrooms.
 +
* '''''3/01/09:''''' Had new hot water tank installed.
 +
* '''''5/05/09:''''' New windows installed in bottom two bedrooms.
 +
* '''''6/25/09:''''' New gate installed at back of property.
 +
* '''''7/03/09:''''' New front and storm doors installed.
'''Current:'''
'''Current:'''
-
* Landscape the front and side of the house. (07/07)
+
* Have old kitchen pipes capped.
-
* Refinish sun room floor.
+
* Landscape the side of the house.
-
* Refinish dining room floor.
+
* Landscape the front and back of the house.
 +
* Replace the windows in the bathroom and stair landing.
-
'''2007:'''
+
'''2009:'''
 +
* Install new furnace.
* Finish the kitchen (cap pipes, re-walling, fixing damaged floor).
* Finish the kitchen (cap pipes, re-walling, fixing damaged floor).
-
* Install block windows in the basement.
 
* Rip down old and put in new gutters.
* Rip down old and put in new gutters.
-
* Reconstruct front steps and pillar.
 
* Fix wiring and install light fixture in back hallway.
* Fix wiring and install light fixture in back hallway.
* Fix porch light.
* Fix porch light.
* Install new doorbell.
* Install new doorbell.
 +
* Refinish sun room floor.
 +
* Refinish dining room floor.
-
'''2008:'''
+
'''Maybes:'''
* Install radiator covers.
* Install radiator covers.
-
* Install a new hot water tank.
+
* Install block windows in the basement.
-
* Replace the windows in the upstairs bedrooms and in the bathroom.
+
* Reconstruct front steps and pillar.
-
* Replace the rest of the old fencing in the backyard. (Oneida Fence)
+
-
* Landscape the back of the house.
+
* Replace the windows in the downstairs bedrooms.
* Replace the windows in the downstairs bedrooms.
* Replace the windows in living room, dining room, and stairs.
* Replace the windows in living room, dining room, and stairs.
-
 
-
 
-
'''2009 and beyond:'''
 
* Redo the first floor bathroom.
* Redo the first floor bathroom.
-
* Refinish the attic space (either as master bedroom or play space).
+
-
* Construct a second floor bathroom.
+
-
* Refinish the basement.
+
-
 
+
'''Ongoing:'''
'''Ongoing:'''
Line 51: Line 54:
* Carpet last bedroom.
* Carpet last bedroom.
* New doors throughout the house.
* New doors throughout the house.
 +
* New doorknobs throughout the house.

Latest revision as of 20:28, 6 September 2009

Listed in order of importance/projected time frame.

Completed:

  • 7/09/05: Carpeted upstairs side bedroom.
  • 3/31/06: Replaced carpeting in living room, all hallways, and stairway.
  • 8/18/06: Ripped out bushes in the front of the house.
  • 9/15/06: Replaced all the windows in the front room.
  • 9/17/06: Replaced the water-damaged clapboard.
  • 9/18/06: Windows wrapped with vinyl trim, clapboard primed with one coat.
  • 11/03/06: Put in a new side (security) door.
  • 7/18/07: Had the house repainted.
  • 10/29/07: Put new release valve on furnace.
  • 2/22/08: Replaced side door (cosmetic damage on original installation).
  • 6/09/08: Finished construction of stone planter in front of house.
  • 6/23/08: Completed painting of garage, arbor, and warranty work on house.
  • 6/30/08: Replace the windows in the two upstairs bedrooms.
  • 3/01/09: Had new hot water tank installed.
  • 5/05/09: New windows installed in bottom two bedrooms.
  • 6/25/09: New gate installed at back of property.
  • 7/03/09: New front and storm doors installed.


Current:

  • Have old kitchen pipes capped.
  • Landscape the side of the house.
  • Landscape the front and back of the house.
  • Replace the windows in the bathroom and stair landing.


2009:

  • Install new furnace.
  • Finish the kitchen (cap pipes, re-walling, fixing damaged floor).
  • Rip down old and put in new gutters.
  • Fix wiring and install light fixture in back hallway.
  • Fix porch light.
  • Install new doorbell.
  • Refinish sun room floor.
  • Refinish dining room floor.


Maybes:

  • Install radiator covers.
  • Install block windows in the basement.
  • Reconstruct front steps and pillar.
  • Replace the windows in the downstairs bedrooms.
  • Replace the windows in living room, dining room, and stairs.
  • Redo the first floor bathroom.


Ongoing:

  • Random painting throughout the house.
  • Random patching.
  • Replace old carpeting.
  • Carpet last bedroom.
  • New doors throughout the house.
  • New doorknobs throughout the house.
Personal tools