Home Improvements

From Gothpoodle

(Difference between revisions)
Jump to: navigation, search
Line 12: Line 12:
'''Current:'''
'''Current:'''
-
* Rip out the sun room carpeting and refloor. ($650)
+
* Have the house repainted.
-
* Refloor dining room floor (overlay). ($650)
+
* Refinish sun room floor.
-
* Install radiator covers.
+
* Refinish dining room floor.
'''2007:'''
'''2007:'''
-
* Replace the windows in the upstairs bedrooms and in the bathroom.
+
* Landscape the front of the house (keep hostas and little bush).
-
* Install a new hot water tank. ($850)
+
* Finish the kitchen (cap pipes, re-walling, fixing damaged floor).
* Finish the kitchen (cap pipes, re-walling, fixing damaged floor).
* Install block windows in the basement.
* Install block windows in the basement.
-
* Have the house repainted. ($2500)
 
* Rip down old and put in new gutters. ($1200)
* Rip down old and put in new gutters. ($1200)
* Reconstruct front steps and pillar.
* Reconstruct front steps and pillar.
Line 28: Line 26:
* Fix porch light.
* Fix porch light.
* Install new doorbell.
* Install new doorbell.
-
* Landscape the front of the house (keep hostas and little bush).
 
-
* Replace the rest of the old fencing in the backyard. (Check w/ Oneida Fence)
 
-
* Replace the windows in the downstairs bedrooms.
 
-
* Replace the windows in living room, dining room, and stairs.
 
-
* Landscape the back of the house.
 
'''2008 and beyond:'''
'''2008 and beyond:'''
 +
* Replace the rest of the old fencing in the backyard. (Check w/ Oneida Fence)
 +
* Landscape the back of the house.
 +
* Install a new hot water tank. ($850)
 +
* Replace the windows in the downstairs bedrooms.
 +
* Replace the windows in living room, dining room, and stairs.
 +
* Replace the windows in the upstairs bedrooms and in the bathroom.
 +
* Install radiator covers.
* Redo the first floor bathroom.
* Redo the first floor bathroom.
* Refinish the attic space (either as master bedroom or play space).
* Refinish the attic space (either as master bedroom or play space).

Revision as of 21:42, 25 March 2007

Listed in order of importance/projected time frame.

Completed:

  • 7/09/05: Carpeted upstairs side bedroom.
  • 3/31/06: Replaced carpeting in living room, all hallways, and stairway.
  • 8/18/06: Ripped out bushes in the front of the house.
  • 9/15/06: Replaced all the windows in the front room.
  • 9/17/06: Replaced the water-damaged clapboard.
  • 9/18/06: Windows wrapped with vinyl trim, clapboard primed with one coat.
  • 11/03/06: Put in a new side (security) door.


Current:

  • Have the house repainted.
  • Refinish sun room floor.
  • Refinish dining room floor.


2007:

  • Landscape the front of the house (keep hostas and little bush).
  • Finish the kitchen (cap pipes, re-walling, fixing damaged floor).
  • Install block windows in the basement.
  • Rip down old and put in new gutters. ($1200)
  • Reconstruct front steps and pillar.
  • Fix wiring and install light fixture in back hallway.
  • Fix porch light.
  • Install new doorbell.


2008 and beyond:

  • Replace the rest of the old fencing in the backyard. (Check w/ Oneida Fence)
  • Landscape the back of the house.
  • Install a new hot water tank. ($850)
  • Replace the windows in the downstairs bedrooms.
  • Replace the windows in living room, dining room, and stairs.
  • Replace the windows in the upstairs bedrooms and in the bathroom.
  • Install radiator covers.
  • Redo the first floor bathroom.
  • Refinish the attic space (either as master bedroom or play space).
  • Construct a second floor bathroom.
  • Refinish the basement.


Ongoing:

  • Random painting throughout the house.
  • Random patching.
  • Replace old carpeting.
  • Carpet last bedroom.
  • New doors throughout the house.